Air conditioning system
Jump to :
9.1 The inspector shall:
- open readily openable access panels.
- inspect:
- central and through-wall equipment.
- distribution systems.
- describe:
- energy source(s).
- cooling systems.
9.2 The inspector is NOT required to:
- inspect electronic air filters.
- determine cooling supply adequacy or distribution balance.
- inspect window air conditioning units.
next page